|
Brundage Communications Site Project
This project highlights the communication radar site
we have built on the top of Brundage Mountain. The block building has a
12" thick concrete roof to protect
the structure from the snow load up there, which can exceed 15'
in the winter. The metal box on the roof , shown in the last page, is for
winter access. They ride in on snow machines and open the hatch. The pad
which is 4' deep took 110 yds of concrete.
 |
Site Pad Form and Reinforcement Setup |
 |
Site Pad Setup Completed/Concrete Pour |
 |
Finished Communications Site |
|